Monday, 3 March 2008
| 8:30 |
Welcome, Meeting Logistics, Agenda
|
R. Raffray, L. Waganer |
| 8:40 |
Status and update on pathways project
|
F. Najmabadi
|
| |
|
ARIES-Pathways Technical
Working Groups |
| 8:55 |
Progress developing an evaluation methodology for fusion R&D
(ppt) |
M. Tillack |
| |
Technical Readiness Level For Control of Plasma Power Flux Distribution
(ppt) |
A. Turnbull |
| |
Power Management Technical Working Group:
TRL for Heat and Particle Flux Handling
(ppt) |
R. Raffray |
| |
TRL tables: power conversion and lifetime
(ppt) |
M. Tillack |
| |
Discussion of Technical Issues, TRL Definitions, and Interim Report
(ppt) |
L. Waganer |
| |
Safety and Environment TRL's
(pdf) |
D. Steiner |
| |
Licensing Options for the First US Demonstration Fusion Power Plant
(ppt) |
S. Abdel-Khalik |
| |
Risk and Opportunity Management:
A Formal Process for use by Teams
(ppt) |
T. Weaver |
| |
Approach for a High Performance Fusion Power Source Pathway
(ppt) |
D. Meade |
| |
Top Level Requirements for Future Fusion Facilities
(pdf) |
D. Steiner |
| |
Advanced Fabrication - Future Vision for Fusion?
(ppt) |
L. Waganer |
| |
ARIES-Pathways Systems Code
Development |
| |
LSA Factors and External Costs for ARIES System Code
(pdf) |
L. El-Guebaly |
| |
Preliminary ARIES-AT-DCLL Radial Build for ASC
(pdf) |
L. El-Guebaly |
| |
Costing of magnets, or
How can the costs of ARIES be that much smaller that those of ITER
(pdf) |
L. Bromberg |